Wednesday, October 27, 2010

Foundation Progress

Two weeks later and the forms are up and concrete trucks are on the way for a pour this morning.  In the interim two weeks, the structural design was being finalized, utilities disconnected from existing house, footing excavations and forms, additional grading for ramps for concrete trucks.  We are in a 110 mph wind zone which requires structural hardware from foundation to frame to resist uplift.  All these details were coordinated and communicated to the concrete subcontractor as they will install the bolt anchors into the wet concrete after pouring at specific locations.

                                                                 Forms being installed
Garage Door Wall
Rear wall out to Patio
Connection to Existing Wall
Concrete Pump
Fill her up!
Hardware for Structure in Walls
Pouring Walls